PROJECTS

Precision in Every Undertaking

We transform projects across Southern Africa. From complex civil engineering wonders to thriving shopping malls, IRC Projects delivers tailored steel fabrication, advanced cutting, and formwork solutions for diverse sectors.

Featured Projects

Lesotho Highlands Water Project – Transfer Tunnel Shutters

  • Duration: March 2024 – Ongoing
  • Location: Lesotho
  • Main Contractor: Kopana Ke Matla JV
  • We engineered and manufactured the tunnel shutters for Phase 2 of the Polihali Dam project. These shutters are shaping over 38 km of water transfer tunnel.

Double-Girder Overhead Crane

  • Duration: June 2019
  • Location: Johannesburg, Gauteng
  • Commissioned By: Remacon
  • We designed and fabricated a bespoke 50-tonne crane, optimised to enhance operational efficiency at the Remacon plant.

Water Technology Plastic Industries – Borehole Pipe Slotting

  • Duration: Ongoing
  • Location: Johannesburg, Gauteng
  • Commissioned By: WTPI
  • Utilising plasma cutting, we produce precision slots in borehole pipes for export—delivering flawless symmetry in record time.

Cornubia Shopping Mall – Column & Beam Formwork

  • Duration: March 2016 – September 2017
  • Location: Mount Edgecombe, Kwa-Zulu Natal
  • Main Contractor: WBHO Construction
  • We provided formwork for the main structure and produced 6 km of DELTABLOC® concrete safety barriers for this greenfield ‘retail park’ project featuring Africa’s largest solar rooftop.

Key Ridge Bridges – Incremental Launch Shutters

  • Duration: March 2016 – September 2017
  • Location: Mount Edgecombe, Kwa-Zulu Natal
  • Main Contractor: WBHO Construction
  • We provided formwork for the main structure and produced 6 km of DELTABLOC® concrete safety barriers for this greenfield ‘retail park’ project featuring Africa’s largest solar rooftop.

Fourways Mall Expansion – Precast Columns & Beams

  • Duration: November 2017 – May 2018
  • Location: Witkoppen, Sandton, Gauteng
  • Main Contractor: MECSA (MOTA-ENGIL Construction South Africa)
  • Our prefabricated formwork accelerated the project’s timeline, halving it compared to traditional methods.

SANRAL N2-N3 Upgrade – Safety Barrier Moulds

  • Duration: May 2023 – Ongoing
  • Location: Kwa-Zulu Natal
  • Main Contractor: Various
  • As partner to DELTABLOC South Africa, our moulds produced over 2 600 concrete barriers—totaling 130 km—for safe traffic management during the upgrade.

Lesotho Highlands Water Project – Bridge Construction

  • Duration: April 2024 – November 2024
  • Location: Lesotho
  • Main Contractor: Concor
  • We fabricated formwork for bridge beams, contributing to this critical infrastructure project.

Why choose IRC Projects?

  • Proven Expertise: We bring precision, innovation and reliability to each project.
  • Track Record: Our formwork solutions streamline construction and enhance efficiency.
  • Trusted Delivery: From design through fabrication, we deliver exceptional outcomes—on time and on budget.